ERP Software Selection Guide for Executive Sponsors
How to Define ERP Fit, Evaluate the Complete Candidate, and Preserve the Basis of Selection Before Major Commitments Become Difficult to Reverse
The right ERP decision is the complete combination of platform, implementation partner, implementation approach, commercial structure, and SOW that provides the strongest governed evidence that it can operationalize Sponsor Intent and support the value the investment was authorized to create.
ERP software selection begins by defining the enterprise the Executive Sponsor intends to create. The decision then evaluates whether the complete candidate can support that intended operating model, distribution of authority, management system, economics, information architecture, technology architecture, enterprise intelligence architecture, Business Outcomes, scope, implementation approach, and evidence requirements.
This ERP Software Selection Guide gives Executive Sponsors and Business-Side leaders a practical framework for defining ERP fit before product demonstrations, evaluating the complete candidate through Sponsor-governed criteria and evidence, converting the basis of selection into the SOW, and preserving continuity through implementation, Value Realization, and Operations.

Solution Selection is the governing decision that determines whether platform capability becomes intended business value.
What Is ERP Software Selection?
ERP software selection is the governed process of defining what ERP fit means for the intended enterprise and determining which complete candidate provides the strongest evidence that it can operationalize Sponsor Intent. The complete candidate includes the platform, implementation partner, implementation approach, commercial structure, SOW, supporting products, required integrations, third-party dependencies, governance conditions, and organizational commitments under evaluation.
Throughout this guide, “candidate” refers to the complete proposed solution candidate, including the platform, implementation partner, implementation approach, commercial structure, and contractual model under evaluation.
A complete ERP selection evaluates more than product functionality. It considers how each candidate will support the intended Business Outcomes, fit the operating environment, preserve required business meaning, satisfy scope boundaries, produce evidence, meet contractual obligations, manage risk, and support acceptable economics across implementation and operations.
The selection decision should answer one governing question:
Which complete candidate provides the strongest governed evidence that it can operationalize the Sponsor Intent authorized by the Executive Sponsor and support the value the investment was authorized to create?
That question establishes a stronger standard than identifying the product with the highest feature score. It directs the organization to evaluate the complete model required to convert platform capability into sustained operating value.
Why ERP Software Selection Determines More Than Software
An ERP platform influences how work is structured, how decisions are made, how responsibilities are assigned, how data is defined, how controls operate, and how performance is measured. The selected platform also affects the implementation model, internal resource requirements, integration architecture, operating costs, change requirements, and the organization’s ability to adopt future capabilities.
The implementation partner influences how the platform’s potential becomes operating reality. Partner staffing, experience, continuity, assumptions, methods, subcontractor dependencies, evidence obligations, and accountability materially affect cost, timing, risk, and outcome confidence.
Commercial agreements convert selection representations into enforceable commitments. Scope, resources, capabilities, responsibilities, evidence requirements, acceptance conditions, validation obligations, remediation duties, payment terms, and change controls determine whether the reasons a candidate was selected remain durable after negotiation.
ERP software selection is therefore an investment decision, an operating-model decision, an implementation decision, and a governing decision. The software is one essential component of the complete decision.
From Software Selection to Solution Selection
Enterprise application boundaries are changing. Business capabilities increasingly span transactional platforms, supporting applications, data and analytics environments, integration services, automation, AI, agents, implementation partners, operating changes, governance conditions, and human Decision Authorities. The application remains important, but it is one component of the solution the enterprise is actually selecting.
For that reason, Alentra evaluates the complete candidate rather than the product alone. The complete candidate includes the core platform, supporting products and services, implementation partner, implementation approach, data and integration dependencies, commercial structure, SOW, governance conditions, evidence and validation requirements, third-party dependencies, and organizational commitments required to operationalize Sponsor Intent.
The same governing principle extends beyond ERP. As ERP, CRM, analytics, data, automation, and Agentic AI increasingly operate as interconnected components of an enterprise architecture, Executive Sponsors need a selection standard that remains durable as product categories and application boundaries change.
The product is a component. The complete candidate is the decision. Sponsor Intent is the standard against which that decision should be made.
Who Should Own the ERP Selection Decision?
The Executive Sponsor remains accountable for the business purpose, intended outcomes, investment boundaries, material tradeoffs, and authorization of the ERP selection decision. Specialized participants provide expertise, analysis, evidence, and recommendations within their respective responsibilities.
The selection process should establish clear Decision Authorities for material questions involving Business Outcomes, scope, operating-model changes, risk acceptance, investment, commercial commitments, data, controls, accountability, and implementation readiness. These authorities should remain visible throughout evaluation, negotiation, authorization, and mobilization.
The Business-Side should retain authority over the meaning of the business purpose and the conditions the selected ERP must support. Technology, procurement, finance, legal, security, compliance, vendors, and implementation partners contribute essential expertise without redefining Sponsor Intent through their individual work products.
Human Decision Authorities govern the decision loop.
Define ERP Fit Before Product Demonstrations Begin
ERP fit does not exist in the abstract. A platform fits the enterprise the Executive Sponsor intends to create, including its operating model, distribution of authority, management system, economics, information architecture, technology architecture, and enterprise intelligence architecture.
Alentra uses 26 Foundational Sponsor Intent Drivers to help make the highest-leverage positions explicit before product demonstrations begin. The drivers are organized around six Executive Sponsor questions:
-
How should the enterprise operate?
-
How should authority be distributed?
-
How should performance and value be measured?
-
How should information be governed?
-
How should technology be architected?
-
How should intelligence, AI, and human decision-making work together?
Foundational Sponsor Intent Drivers are the Sponsor-owned positions that materially influence ERP fit, implementation strategy, commercial commitments, governance requirements, and expected outcomes. They should be sufficiently defined before consequential ERP selection decisions are made.
Foundational Sponsor Intent Drivers are the Sponsor-owned positions that materially influence ERP fit, implementation strategy, commercial commitments, governance requirements, and expected outcomes. They should be sufficiently defined before consequential ERP selection decisions are made.
The 26 drivers do not represent the complete Sponsor Intent required for the Enterprise Transformation Program. They establish the high-leverage positions that shape downstream Business Intent, Scope Intent, Transformation Approach Intent, Meaning-Aligned Requirements, demonstration scenarios, evaluation criteria, implementation assumptions, and commercial commitments.
The 26 Foundational Sponsor Intent Drivers define the enterprise the solution must fit. The 15 Solution Selection Criteria evaluate whether the complete candidate can operationalize Sponsor Intent. ERP-specific evaluation factors determine what evidence of fit must be examined for the ERP solution being selected.
Begin ERP Selection With Sponsor Intent
Sponsor Intent is the Executive Sponsor-owned expression of purpose and the foundation of the Transformation Definition. It is formed by three Sponsor-owned responsibilities:
-
Business Intent
-
Scope Intent
-
Transformation Approach Intent
Business Intent defines the intended business results, priorities, governing meaning, accountability expectations, validation requirements, and conditions that must remain true for the Enterprise Transformation Program to be considered successful.
Scope Intent defines the complete business-change boundary required to achieve the intended outcomes. It establishes what the Enterprise Transformation Program will address, exclude, sequence, defer, transfer, or depend upon, and makes explicit the assumptions, responsibilities, interfaces, integrations, customizations, organizational impacts, external dependencies, and Units of Transformation included within the authorized scope.
A Unit of Transformation is the smallest complete business-change boundary capable of meaningfully achieving, enabling, protecting, or validating a Business Outcome. A Unit of Transformation may span multiple processes, roles, decisions, systems, interfaces, data sets, controls, reports, organizational groups, and technology components. By defining scope through Units of Transformation rather than isolated requirements, features, modules, or workstreams, Scope Intent helps ensure that the complete business-change boundary required to achieve the intended outcome remains visible, governable, and comparable throughout Solution Selection, implementation, and operations.
Transformation Approach Intent makes implementation assumptions explicit before the detailed project plan is created. For each in-scope domain and process, it defines the expected degree of business-process change, organizational change, operating-model change, customization, integration responsibility, data remediation, sequencing, resource requirements, risk acceptance, and other factors that materially influence implementation effort, estimates, staffing, timelines, and delivery planning. It prevents parties from assuming different levels of transformation effort, complexity, or business change across the Enterprise Transformation Program while believing they are aligned.
Together, these responsibilities make explicit the outcome assumptions, scope assumptions, implementation assumptions, responsibilities, dependencies, and decision boundaries that materially influence solution selection, implementation effort, commercial commitments, expected value, Total Cost of Ownership, and the likelihood of achieving the intended Business Outcomes.
Sponsor Intent is operationalized through Sponsor Intent Assets, which make approved Sponsor Intent explicit, actionable, referenceable, accessible, governable, validatable, traceable, and durable throughout the Enterprise Transformation Program lifecycle. Initial Sponsor Intent Assets are expected to be partial and are refined as decisions are made, assumptions change, evidence develops, and operating conditions evolve.
Core Business Definitions establish the authoritative business meaning used to classify, measure, govern, automate, report, validate, and make decisions across the Enterprise Transformation Program and ongoing operations.
Business Intent Design is the discipline responsible for progressively defining Sponsor Intent before consequential commitments are made. Intent Governance preserves and governs that purpose as participants, decisions, assumptions, evidence, and operating conditions change.
Intent Governance addresses both the enduring challenge of transformation drift and the emerging requirements of Agentic AI. It preserves authoritative Sponsor Intent as decisions, participants, assumptions, and operating conditions change. It also makes intended outcomes, priorities, boundaries, accountabilities, validation requirements, and evidence expectations explicit enough to guide increasingly autonomous execution.
People compensated for ambiguity. Autonomous agents amplify it.
The Alentra Methodology Governs the ERP Selection Process
The Alentra Methodology provides the canonical 30-step Transformation Definition and Solution Selection process supported by The CFO-TA. It governs how Sponsor Intent is progressively defined, how Business Outcomes and Conditions of Success are established, how Scope Intent and Transformation Approach Intent are authorized, how candidates are evaluated, and how the selection basis is preserved through contracting and implementation mobilization.
The methodology also governs how Meaning-Aligned Requirements are developed, Sponsor-controlled demonstrations are structured, evidence is classified, risks and assumptions are assessed, tradeoffs are authorized, and decisions are recorded. These activities operate as part of one integrated Enterprise Transformation Program methodology rather than as a separate ERP selection process.
The methodology connects several distinct but integrated layers of the selection decision:
-
Foundational Sponsor Intent Drivers define the high-leverage Sponsor positions that shape ERP fit.
-
Sponsor Intent establishes the complete governing standard through Business Intent, Scope Intent, and Transformation Approach Intent.
-
Meaning-Aligned Requirements translate Sponsor Intent into required capabilities, behaviors, boundaries, and evidence expectations.
-
Sponsor-controlled demonstrations produce comparable evidence under common business conditions.
-
The 15 ERP Software Selection Criteria evaluate the complete candidate.
-
Governing Tradeoff Decisions preserve mandatory conditions and Sponsor-owned priorities.
-
The SOW converts material selection commitments into enforceable obligations.
-
Implementation readiness confirms that the authorized decision can responsibly progress.
-
The governed artifact chain preserves continuity through implementation, Value Realization, and Operations.
The 15 ERP Software Selection Criteria on this page define what Executive Sponsors should evaluate when applying the Alentra Methodology to an ERP selection decision.
The Alentra Methodology governs the process. Sponsor Intent defines the standard. The 15 ERP Software Selection Criteria govern evaluation of the complete candidate.
Why Traditional ERP Selection Criteria Are Incomplete
Traditional ERP selection criteria commonly begin with functional requirements, departmental requests, current system limitations, technical standards, vendor questionnaires, product categories, implementation estimates, and pricing. These inputs provide useful information, but they do not establish the complete business standard the selected platform and implementation partner must satisfy.
A functional requirement can describe expected system behavior without defining why that behavior matters, which Business Outcome it supports, what boundaries must remain intact, who holds Decision Authority, how exceptions should be handled, or what evidence will demonstrate that the intended result has been achieved.
A feature comparison can show that several ERP platforms possess similar capabilities. It cannot determine whether those capabilities should be configured and applied in a manner that supports the organization’s intended operating behavior, accountability model, Core Business Definitions, evidence expectations, approved Sponsor Intent, and authorized Transformation Approach Intent.
A price comparison can identify a lower-cost proposal without determining whether the lower-cost option weakens intended value, shifts responsibility to the client, increases Partner Delivery Risk, depends on future capability, or requires extensive customization. The apparent savings may simply defer cost, effort, risk, or complexity to later stages of the Enterprise Transformation Program.
A forecast ROI can appear compelling while depending on uncertain assumptions about scope, implementation effort, adoption, benefit timing, attribution, operating costs, and the durability of expected results. Comparing economic alternatives responsibly requires governed assumptions, normalized scope, Expected Value Feasibility, and a complete view of Total Cost of Ownership.
Traditional criteria organize the comparison.
Sponsor-governed criteria establish what the comparison must prove.
A Selection Standard Designed Beyond Today's Application Boundaries
The principles underlying this framework extend beyond traditional ERP selection. As enterprise architectures increasingly combine transactional platforms, CRM, data and analytics environments, integration, automation, AI, and autonomous agents, the boundaries of the application being selected are becoming less definitive. What does not change is the Executive Sponsor’s responsibility to define the intended enterprise, establish Sponsor Intent, evaluate the complete candidate against that intent, require evidence, govern material tradeoffs, and preserve the basis of selection.
The 26 Foundational Sponsor Intent Drivers establish the enterprise the solution must fit. The 15 Solution Selection Criteria provide a common Sponsor-governed evaluation standard. Category-specific evaluation factors then establish the additional evidence required for ERP, CRM, data and analytics, Agentic AI, and other solution classes.
As the application boundary becomes less definitive, the selection boundary must become more complete.
The 15 Solution Selection Criteria Applied to ERP
The 15 Solution Selection Criteria evaluate whether the complete candidate can operationalize Sponsor Intent. In an ERP selection, they assess the platform, implementation partner, implementation approach, commercial structure, SOW, governance conditions, evidence model, validation readiness, economic exposure, risks, assumptions, dependencies, and organizational commitments as connected elements of one investment decision.
The Foundational Sponsor Intent Drivers inform several criteria, especially Sponsor Intent Conformance, Fit-for-Purpose Alignment, Meaning and Decision Integrity, Data, Analytics, Automation, and AI Governance, and Risks, Assumptions, Dependencies, and Tradeoffs. They do not replace the complete evaluation standard.
These criteria are an application of the Alentra Methodology during Solution Selection. They define what the selection decision must evaluate while the Alentra Methodology governs how Sponsor Intent is progressively defined, candidates are assessed, evidence is governed, tradeoffs are authorized, commitments are preserved, and the selection basis continues into implementation and operations.
Traditional ERP selection often concentrates on features, demonstrations, implementation estimates, and pricing. The CFO-TA advocates a broader Sponsor-governed evaluation of purpose, outcomes, scope, fit, meaning, evidence, partner capability, delivery risk, implementation readiness, value, cost, contract enforceability, AI governance, validation readiness, assumptions, dependencies, and tradeoffs before major commitments become difficult to reverse.
The 15 Criteria at a Glance
1. Sponsor Intent Conformance
Can the candidate operationalize the Sponsor Intent authorized by the Executive Sponsor without requiring an unauthorized material change to that intent?
2. Business Outcome Support
How credibly can the candidate support the approved Business Outcomes, under what conditions, and with what evidence?
3. Conditions of Success
Does the complete proposal support Capital Protection, Outcome Confidence, AI & Data Integrity, and Compliance Proof?
4. Fit-for-Purpose Alignment
Is the candidate naturally suited to the business environment, operating model, complexity, and transformation the organization intends to establish?
5. Scope and Unit of Transformation Coverage
Does the proposal completely and comparably cover the authorized business-change boundary required to achieve the intended Business Outcomes?
6. Meaning and Decision Integrity
Can the solution preserve approved business meaning, Decision Authority, accountability, decision boundaries, exception rules, escalation paths, and evidence requirements as work becomes increasingly automated?
7. Governed Selection Evidence
Are candidate claims supported by observable, attributable, traceable, accessible, reviewable, and sufficient evidence produced under known conditions?
8. Implementation-Partner Capability
Does the proposed implementation partner possess the demonstrated capability required to convert platform potential into operating reality?
9. Partner Delivery Risk
Does the specific delivery model provide a credible path to the authorized result, and where does it expose the Business-Side to material delivery risk?
10. Implementation Readiness
Has the selected solution and implementation model reached the level of definition, authority, resource commitment, environmental preparation, and dependency resolution required to mobilize responsibly?
11. Value Feasibility and Total Cost of Ownership
Does the evidentiary strength and feasibility of the expected value justify the complete cost, risk, and commitment required to achieve it?
12. Commercial and Contractual Enforceability
Can the material commitments supporting the selection decision survive negotiation and become enforceable?
13. Data, Analytics, Automation, and AI Governance
Can the resulting data, analytics, automation, and AI environment operate within explicit purpose, authority, accountability, boundary, evidence, validation, and governance conditions?
14. Validation and Outcome Evidence Readiness
Can the selected platform and implementation partner support the Business-Side’s validation responsibilities and produce the evidence required to prove continuing conformance with Sponsor Intent and achievement of the intended Business Outcomes?
15. Risks, Assumptions, Dependencies, and Tradeoffs
Are material risks, assumptions, dependencies, exclusions, qualifications, limitations, and tradeoffs visible and governed by the proper Decision Authorities?
For the complete framework and detailed explanation of each criterion:
Ecosystem Coherence and Justified Specialization
Improving integration does not eliminate the architectural consequences of selecting components from different platforms and providers. Connectivity is only one dimension of interoperability. Executive Sponsors must also consider shared business meaning, data authority, identity and permissions, security, decision logic, governance, evidence, operational dependencies, commercial relationships, and accountability across the complete solution.
The traditional choice between an integrated suite and best-of-breed applications is therefore becoming a more consequential architectural decision. A coherent platform ecosystem can provide value through greater consistency across applications, data, integration, analytics, automation, AI, security, governance, and future agents. Specialized components can provide differentiated capability where that capability justifies the additional architectural and governance boundaries introduced.
The governing question is no longer simply whether the enterprise prefers an integrated suite or best-of-breed products.
Where does ecosystem coherence create material enterprise value, and where does specialized capability justify introducing another boundary?
The best individual component does not necessarily produce the strongest complete solution. Solution Selection should therefore evaluate each component in the context of the complete architecture required to operationalize Sponsor Intent.
Agentic ERP Changes the Evaluation Standard
As ERP platforms embed copilots, agents, autonomous workflows, and decision-support capabilities, organizations must evaluate more than intelligence. They must evaluate purpose, business meaning, authority, accountability, decision boundaries, exceptions, evidence, validation, and governance.
A modern ERP agent can approve transactions, route work, grant exceptions, recommend actions, and initiate business processes. The question is whether those actions will be performed according to the business meaning, authority structure, decision boundaries, accountability requirements, and evidence expectations approved by the Executive Sponsor.
Capability determines what a system can do. Meaning and Decision Integrity determines what it should do.
The same criteria used to evaluate ERP suitability are increasingly required to evaluate autonomous behavior. Executive Sponsors should ask what an agent can do, what it should be allowed to do, under whose authority, according to which Core Business Definitions, within what decision boundaries, with what exception rules, and with what evidence.
AI-enabled capabilities should be evaluated through governance readiness. An AI-enabled capability becomes suitable for implementation when its purpose, inputs, outputs, boundaries, authority, accountability, data conditions, exceptions, evidence, and validation requirements are sufficiently explicit.
People compensated for ambiguity. Autonomous agents amplify it.
Common ERP Software Selection Mistakes
Executive Sponsors frequently encounter avoidable risks during Solution Selection. These issues often emerge long before implementation begins and can materially influence scope, cost, timeline, accountability, contractual commitments, and expected value.
Beginning Product Demonstrations Before Defining Fit
Product demonstrations become selection events when the organization has not defined the enterprise the ERP must support. Presentation quality, familiar capabilities, current frustrations, and evaluator preferences then begin shaping the future operating model by default.
Before demonstrations begin, the Executive Sponsor should establish sufficiently clear positions on the applicable Foundational Sponsor Intent Drivers. Those positions should then inform Sponsor Intent, Meaning-Aligned Requirements, demonstration scenarios, evidence expectations, evaluation criteria, and material tradeoff boundaries.
Selecting Against Features Rather Than Purpose
The strongest product in a generic category does not automatically represent the strongest choice for a specific Enterprise Transformation Program. A platform can possess extensive capabilities while remaining poorly suited to the organization’s intended Business Outcomes, future-state business environment, operating model, scope, Core Business Definitions, accountability structure, and Transformation Approach Intent. ERP candidates should therefore be evaluated against the Sponsor Intent they must operationalize rather than against generic feature lists alone.
Allowing Vendors To Control Demonstrations
Vendor-controlled demonstrations optimize the presentation around the vendor’s preferred capabilities, scenarios, data, and operating conditions. Sponsor-controlled demonstrations require candidates to perform defined business scenarios, address common conditions and exceptions, disclose limitations and dependencies, and produce specified evidence. This creates a stronger basis for comparing platform capability, implementation-partner understanding, configuration requirements, implementation implications, Partner Delivery Risk, and value feasibility.
Comparing Proposals With Different Scope
Organizations frequently compare proposals containing materially different scope boundaries, Units of Transformation, assumptions, responsibilities, exclusions, dependencies, implementation approaches, client obligations, customizations, future capabilities, and expected degrees of business-process change. Proposal normalization should establish a common evaluation basis before implementation estimates, pricing, Total Cost of Ownership, and expected value are compared.
Treating Partners and Platforms As One Decision
Platform capability and implementation-partner capability are separate evaluation questions. The platform must demonstrate that the required capability exists, while the proposed implementation partner must demonstrate the knowledge, experience, leadership, specialized expertise, delivery competencies, and organizational capacity required to convert that capability into operating reality. The specific delivery model must then be evaluated separately for staffing credibility, resource continuity, estimates, dependencies, contingency assumptions, status reporting practices, change-order procedures, commercial structure, and material delivery exposure.
Treating Cost As The Complete Economic Assessment
Organizations devote substantial effort to governing cost because cost has an enforcement mechanism. Value rarely has an equivalent mechanism, allowing expected value, assumptions, responsibilities, and intended outcomes to weaken without creating the same immediate visibility as cost overruns. Value therefore requires explicit governance.
Investment quality depends on two connected dimensions: Expected Value Feasibility and Total Cost of Ownership. Expected Value Feasibility evaluates how credibly the candidate can support the approved Business Outcomes, while Total Cost of Ownership evaluates the complete economic exposure over the authorized analysis horizon. That exposure includes platform, partner, internal resource, Business Intent Design, Sponsor Intent Lifecycle Management, validation, process redesign, data, integration, customization, Agentic AI development, adoption, operations, risk, transition, and future-change costs when applicable.
Evaluating AI As A Product Feature
AI-enabled ERP capabilities should be evaluated through governance readiness. Executive Sponsors should determine the purpose each capability serves, the business meaning it applies, the authority under which it operates, the decisions it can make, the boundaries and exceptions that govern its behavior, the accountability model that applies, and the evidence required to validate continuing alignment with Sponsor Intent.
Capability determines what a system can do. Meaning and Decision Integrity determines what it should do.
Download 'The Real Reason Transformation Programs Underdeliver and Overrun Budgets' Executive Brief
For Executive Sponsors who want a deeper understanding of why transformation programs frequently underdeliver despite significant effort, investment, and governance activity, download 'The Real Reason Transformation Programs Underdeliver and Overrun Budgets'. The Executive Brief examines the structural causes of transformation drift, explains why leadership intent becomes increasingly difficult to preserve as complexity grows, and outlines what Executive Sponsors can do to remain in control throughout the lifecycle.
Request the Complete Solution Selection Playbook
Understanding the problem is only the first step. The Complete Solution Selection Playbook provides a practical framework for evaluating ERP, CRM, analytics, data, and AI-enabled transformation initiatives before major commitments become difficult to reverse. It explores the questions Executive Sponsors should ask, the evidence they should require, and the structures that help preserve alignment from strategy through operations.
For organizations preparing for a significant transformation investment, the Playbook provides a detailed roadmap for improving decision quality, strengthening governance foundations, reducing avoidable costs, and increasing confidence that approved outcomes remain intact throughout execution.
Next Steps
Organizations preparing for an ERP investment should first define what ERP fit means for the enterprise they intend to create. The applicable Foundational Sponsor Intent Drivers help establish that foundation. Complete Sponsor Intent, Meaning-Aligned Requirements, Sponsor-controlled demonstrations, Governed Selection Evidence, the 15 ERP Software Selection Criteria, Governing Tradeoff Decisions, the SOW, and implementation-readiness conditions then convert that foundation into a defensible selection decision.
The selection basis should remain governed after the preferred candidate is chosen. Sponsor Intent, evidence, decision rationale, commitments, cost and value assumptions, risks, validation requirements, and contract controls should continue as governed lifecycle assets throughout contracting, implementation, validation, operations, Value Realization, and subsequent Sponsor decisions.
>> Explore the 26 Foundational Sponsor Intent Drivers
>> Explore the ERP Selection Criteria Framework
>> Read The Software Comparison Report Paradox: Why Better Vendor Research Hasn’t Solved Transformation Risk
>> Learn the 'The Real Reason Transformation Programs Underdeliver and Overrun Budgets' Executive Brief
About Alentra Advisory
Alentra Advisory helps Executive Sponsors establish, preserve, challenge, validate, monitor, improve, reaffirm, revise, and prove the purpose of major transformation investments.
Business Intent Design helps Executive Sponsors progressively define Sponsor Intent before consequential contractual commitments are made. Sponsor Intent is formed by Business Intent, Scope Intent, and Transformation Approach Intent and serves as the Executive Sponsor-owned expression of purpose and foundation of the Transformation Definition. Intent Governance preserves and governs that purpose as decisions, participants, assumptions, evidence, and operating conditions change.
The CFO-TA is the Executive Sponsor Platform. It supports Executive Sponsors and Business-Side teams through guidance, methodology, authoring, analysis, deliverable production, validation, review, coordination, decision support, continuity, and Sponsor Intent Lifecycle Management across the Enterprise Transformation Program lifecycle.
The Sponsor Intent Lifecycle Management Studio (SILMS) provides the major platform capability used to establish, preserve, challenge, validate, monitor, improve, reaffirm, revise, and prove Sponsor Intent throughout the Enterprise Transformation Program lifecycle and ongoing operations. Human Decision Authorities retain accountability for selection decisions, risk acceptance, tradeoffs, financial judgments, validation conclusions, and authorization.
